The Flathead National Forest is proposing to collect western larch (Larix occidentalis) cones in order to acquire seeds that are vital to meeting the anticipated reforestation needs on the Flathead National Forest. Because of the inherent safety concerns of climbing larch trees (larch trees have brittle stems/ branches and hard bark that easily flakes off in large slabs) collection trees would be felled for safe cone collection.
Shooting cone-bearing branches off trees to collect the cones is another method used for cone collection. This method is time consuming and is not deemed to be an efficient way of collecting larch cones within the short harvest period (2-3 weeks). In addition, larch cones are very small (size of a walnut to a large grape) and significant loss would occur when the cone-bearing branch falls to the ground.
After cones are collected, the felled trees would remain on site. About 270 trees would need to be felled over a 10-year span to meet current anticipated needs. Seed requirements may be met with fewer trees depending on crop abundance. For example, if trees are producing 1/3 bushel of cones, 270 trees would need to be felled but if trees are producing 1 bushel of cones, 90 trees would need to be felled.
To maximize cone production and minimize the amount of tree mortality, larger diameter trees are preferred. Trees selected for cone collection would generally be between 22 and 28 inches diameter at breast height (DBH). Trees chosen for seed collection would be dominate and co-dominate trees that display vigorous growth with healthy crowns and are relatively insect and disease free. Trees selected for cone collection would not be older than 200 years. As larch trees age, their seed viability declines.
An individual seed lot collection in western larch should have a minimum of 20 trees separated by 200 feet in distance. This means approximately 1 tree per acre within a given area could be selected. It is anticipated that each cone-bearing tree will produce between one-third of a bushel and one and one-half bushels of western larch cones. The location of seed collection areas is not determined until a cone survey is done in the summer to determine if there is a sufficient cone crop. Seed trees chosen would be within one mile from a road. Seed collection typically occurs for a period of two to three weeks beginning in early September.
Where possible, cone collection will be focused in existing timber sale areas. However, cone collection could occur in other areas on the Flathead National Forest where adequate crops are identified. Melissa Jenkins, Forest Silviculturist for the Flathead Forest said “the amount of seed currently on hand is well below levels necessary to meet our planting needs. Because western larch cone crops do not occur on a regular basis in western Montana, we need to capture larch seed when a sufficient cone crop does occur. It is likely that cone harvest wouldn’t occur in some years due to the sporadic seed cycles of larch.”
Your comments and concerns regarding this project are important to us. Please address any comments or questions by April 16, 2012 to the project team leader, Marsha Moore, at 758-5325, memoore@fs.fed.us, or to Flathead National Forest, 650 Wolfpack Way, Kalispell, MT 59901.
Jeff
Hiking in Glacier.com
Showing posts with label public comment. Show all posts
Showing posts with label public comment. Show all posts
Thursday, March 22, 2012
Monday, January 9, 2012
Public Comments Encouraged for Proposal to Install Telecommunications Tower
Glacier National Park is requesting public comment on a proposal from CenturyLink to install a new telecommunications tower in the St. Mary administrative area inside the park. An environmental assessment financed by the project proponent is being conducted. Public comments on the tower proposal should be directed to the park by February 3.
The tower would service the greater St. Mary area and is part of a larger statewide initiative through the Montana Public Service Commission to upgrade telecommunications facilities to small rural exchanges in Montana.
The telecommunication capacity in the St. Mary area, both inside and outside the park, is currently inadequate to support resident, visitor, and government internet demands. The new tower would upgrade the area's telecommunication capacity to a modern standard and improve the reliability and speed of internet access. The National Park Service's existing 50-foot radio tower in St. Mary would be removed and replaced with a new, approximately 80-foot tall microwave antenna and radio support structure. The new tower would be constructed of steel lattice supported on a concrete footing, and would include a 6-foot diameter microwave dish for CenturyLink and up to three National Park Service antennas.
The new structure would be located next to the existing park telecommunications building in the St. Mary administrative area, and the microwave feed wiring would be connected to the existing CenturyLink equipment building. The new structure would be designed to provide a direct line of sight to the CenturyLink Divide Mountain transfer station.
To date, two alternatives have been identified: 1) The no-action alternative, and 2) an action alternative that would remove the existing National Park Service radio tower and install a new tower.
Comments and concerns on the proposed project should be submitted by Friday, February 3. Comments can be posted online, or may be mailed to:
Superintendent
Glacier National Park
Attn: St. Mary Microwave Tower Proposal
P.O. Box 128
West Glacier, MT, 59936
There will be another opportunity to comment on the project when the environmental assessment is completed.
Jeff
Hiking in Glacier.com
The tower would service the greater St. Mary area and is part of a larger statewide initiative through the Montana Public Service Commission to upgrade telecommunications facilities to small rural exchanges in Montana.
The telecommunication capacity in the St. Mary area, both inside and outside the park, is currently inadequate to support resident, visitor, and government internet demands. The new tower would upgrade the area's telecommunication capacity to a modern standard and improve the reliability and speed of internet access. The National Park Service's existing 50-foot radio tower in St. Mary would be removed and replaced with a new, approximately 80-foot tall microwave antenna and radio support structure. The new tower would be constructed of steel lattice supported on a concrete footing, and would include a 6-foot diameter microwave dish for CenturyLink and up to three National Park Service antennas.
The new structure would be located next to the existing park telecommunications building in the St. Mary administrative area, and the microwave feed wiring would be connected to the existing CenturyLink equipment building. The new structure would be designed to provide a direct line of sight to the CenturyLink Divide Mountain transfer station.
To date, two alternatives have been identified: 1) The no-action alternative, and 2) an action alternative that would remove the existing National Park Service radio tower and install a new tower.
Comments and concerns on the proposed project should be submitted by Friday, February 3. Comments can be posted online, or may be mailed to:
Superintendent
Glacier National Park
Attn: St. Mary Microwave Tower Proposal
P.O. Box 128
West Glacier, MT, 59936
There will be another opportunity to comment on the project when the environmental assessment is completed.
Jeff
Hiking in Glacier.com
Subscribe to:
Posts (Atom)